Case Studies

O2 arena whilst the sun sets
The 02 Arena, London
The design of the O2 Arena's roof had to incorporate state-of-the-art...
Read More
The Courthouse SW1 building
The Courthouse SW1 apartment development
Occupying the former site of the City of Westminster Magistrates' Court...
Read More
Barratt homes construction site
Driving cost savings 'from the ground up' for Barratt Homes
Barratt Homes has benefited from both time and cost savings at 'The Elms...
Read More
Men on building site preparing foundations
Countryside drives carbon reduction with Insulslab
Having been targeted to achieve an additional 25 per cent carbon...
Read More
Foundations on a constructions site
HPC pioneers piled foundations with Insulslab
Insulslab has been adopted by Lincolnshire based HPC Homes for a...
Read More
Case study Kier Construction
Insulslab adopted for custody suite programme
Kier Construction has adopted Insulslab for a nationwide programme of new...
Read More
Insulslab foundations on a construction site
Insulslab gets Lovell Project back on track
An affordable homes development for Milton Keynes Council was...
Read More